In a dense rack, power becomes a bigger item than the rack rent. Even so, most quote comparisons are made by looking only at the monthly rack price, and the first bill comes as a surprise. This guide explains how a colocation power bill is made up, the conversions between power units, choosing a PDU and the ways of lowering the bill that really work.
These four units are constantly confused with one another. It is not possible to compare quotes without knowing the difference.
The table below is based on 220 V single phase, assuming continuous full load. Your real consumption usually stays below these values.
| Current | Power | Monthly consumption | Monthly charge (13₺/kWh) | Typical equivalent |
|---|---|---|---|---|
| 1 A | 220 W | 158 kWh | 2,059 ₺ | 1 efficient 1U server |
| 2 A | 440 W | 317 kWh | 4,118 ₺ | 2 servers or 1 loaded server |
| 4 A | 880 W | 634 kWh | 8,237 ₺ | 3–4 servers + switch |
| 8 A | 1.76 kW | 1,267 kWh | 16,474 ₺ | A full 10U rack |
| 16 A | 3.52 kW | 2,534 kWh | 32,947 ₺ | A medium-density 21U rack |
| 32 A | 7.04 kW | 5,069 kWh | 65,894 ₺ | A dense 42U rack |
If you plan by the label value you commit to more power capacity than necessary and overpay. There are three ways to measure real consumption:
A practical approach: measure average consumption, add a 20–30% allowance for the peak and set your power commitment accordingly.
A PDU (Power Distribution Unit) is the unit that distributes the electricity coming into the rack to the equipment. There are four main types:
| Type | Capability | When it is needed |
|---|---|---|
| Basic | Distribution only | Small setups, if metering is done at rack level |
| Metered | Current metering in total or per outlet | To track consumption under metered billing |
| Switched | Remote outlet on/off | When a frozen server needs a hard reset remotely |
| ATS | Automatic transfer between two sources | To connect a single-PSU device to A+B redundancy |
The last row matters: switches, firewalls and other devices with a single power supply can be connected to only one of the A and B sides. When that side is taken into maintenance, the device shuts down. An ATS PDU closes this gap and gives a single-feed device dual-source redundancy.
PDUs also fall into two groups by the space they take up in the rack: vertical (0U) models sit in the rear channel and do not reduce usable U; horizontal models take up 1U. For layout planning, see the U calculation guide for details.
In SistemDC racks, dual PDUs (A+B) provide redundant feeds. On servers with dual power supplies the first cable is connected to side A and the second to side B. The aim is for the system to keep running when one side is taken into maintenance or fails.
Two engineering rules come into play here:
Rack plans can be provisioned with power capacity from 2 kVA up to 20 kVA. This is the ceiling value; it is not reflected directly in the bill. In the metered model what you pay is the real consumption read from the meter.
| Allocated capacity | Equivalent (PF 0.9) | Monthly charge at 100% use | At 50% use |
|---|---|---|---|
| 2 kVA | 1.8 kW | 16,848 ₺ | 8,424 ₺ |
| 5 kVA | 4.5 kW | 42,120 ₺ | 21,060 ₺ |
| 10 kVA | 9 kW | 84,240 ₺ | 42,120 ₺ |
| 20 kVA | 18 kW | 168,480 ₺ | 84,240 ₺ |
In shared rack plans the model is different: power is included in the price but there is a ceiling (~220 W for Starter/Business/ATX, ~440 W for Advanced). If your hardware draws more than this limit you need to move to the metered-power rack model. For a plan comparison, see the rack rental prices guide for more.
We covered the industry's general direction on this in the 2026 data center trends article.
How much does a 1 kW server cost in power per month?
1 kW × 720 hours = 720 kWh. At 13₺/kWh that comes to 9,360₺.
How do I convert kVA to kW?
kW = kVA × power factor. A cautious value of 0.9 is used in planning; 10 kVA corresponds to about 9 kW.
Do I pay if I do not use the capacity I am allocated?
Not in the metered model — you pay for the consumption read from the meter. Capacity only defines the upper limit.
What is PUE?
Power Usage Effectiveness is the ratio of a facility's total energy consumption to the consumption of its IT equipment. The closer it gets to 1.0, the lower the cooling and distribution losses. Cold-aisle containment architecture is one of the main practices that improve this ratio.
Can I see my server's current consumption remotely?
Yes. The IPMI/iDRAC/iLO interface provides power readings; if a metered PDU is used it can also be tracked at outlet level.
I have a single-PSU server — how is redundancy provided?
An ATS PDU provides automatic transfer between the A and B sides. This way a single-feed device also benefits from the dual-source infrastructure.